Projects

FURNISH & INSTALL STAIRWELL DEVICES

New York City

WHAT FLOOD? SUBWAY ENTRANCES NOW PROTECTED

When the MTA heard that J-Track had developed an expertise in Flood/Storm Mitigation, business came pouring in. J-Track installed a new flood protection system at 23 subway stair entrances to get ahead of eventual storms that would have shut down service.

SCOPE: TRANSIT & TRACK CONSTRUCTION, CONCRETE WORK, STORM/FLOOD MITIGATION

  • Removing all the existing railing and concrete at street level
  • Installing a new flood protection system comprised of a flexible membrane cover that is unrolled and fastened in the event of a storm

Contact

14 – 45 117th Street
College Point, New York 11356

718.554.2760
info@jtrack.com