Projects

PILOT GROUT SOLUTION – RED LINE

Washington, DC

FIXING LEAKS IN D.C

When word got out that the Washington Metro Area Transit Authority (WMATA) was looking to mitigate a major water leak that others tried to fix on a main commuter line, J-Track, along with our subcontractor, quickly mobilized to Washington, D.C.

SCOPE: GENERAL CONTRACTING, TRANSIT & TRACK CONSTRUCTION, EMERGENCY WORK

  • Provided own hi-rail equipment to inject chemical grout and completely stop the water in miles of tunnels and caverns
  • Completed in six months, mostly during weekend and weeknight outages

Contact

14 – 45 117th Street
College Point, New York 11356

718.554.2760
info@jtrack.com